Difference between revisions of "PEC-REP/Current/RPRT/HRCXIiWDCptrPntTskDrtn"

From Genesys Documentation
Jump to: navigation, search
m (Text replacement - "\|Platform=([^\|]*)GenesysEngage-onpremises([\|]*)" to "|Platform=$1GenesysEngage-cloud$2")
 
(2 intermediate revisions by 2 users not shown)
Line 6: Line 6:
 
|ComingSoon=No
 
|ComingSoon=No
 
|Platform=GenesysEngage-cloud
 
|Platform=GenesysEngage-cloud
|Prereq=
 
 
|Section={{Section
 
|Section={{Section
|sectionHeading=
 
|anchor=
 
 
|alignment=Vertical
 
|alignment=Vertical
|Media=
 
|image=
 
 
|structuredtext=This page describes how you (as a business user or technical business user) can use the ('''CX Insights for iWD''' folder) > '''Capture Point Task Duration Report''' to identify and plan remediation for bottlenecks in the system. The technical business user can then tune routing strategies and associated business rules in order to reduce bottlenecks and routing milestones. This is particularly useful if you base distribution strategies or business operations around the point (the capture point) through which tasks enter the iWD system.
 
|structuredtext=This page describes how you (as a business user or technical business user) can use the ('''CX Insights for iWD''' folder) > '''Capture Point Task Duration Report''' to identify and plan remediation for bottlenecks in the system. The technical business user can then tune routing strategies and associated business rules in order to reduce bottlenecks and routing milestones. This is particularly useful if you base distribution strategies or business operations around the point (the capture point) through which tasks enter the iWD system.
|structuredtextwide=
 
|FAQHeading=
 
 
|Status=No
 
|Status=No
 
}}{{Section
 
}}{{Section
Line 22: Line 15:
 
|alignment=Horizontal
 
|alignment=Horizontal
 
|Media=Image
 
|Media=Image
|image=HRCXICapturePointTaskDuration.png
+
|image=HRCXICapturePointTaskDuration_Cloud11-21.png
 
|structuredtext=This report breaks down the overall average duration time that is spent to complete tasks (from inception within the presource system to termination within iWD) into average task durations at defined milestones along a task’s routed path for each capture point.
 
|structuredtext=This report breaks down the overall average duration time that is spent to complete tasks (from inception within the presource system to termination within iWD) into average task durations at defined milestones along a task’s routed path for each capture point.
  
 
To get a better idea of what this report looks like, view sample output from the report:<br />
 
To get a better idea of what this report looks like, view sample output from the report:<br />
{{Repository|SampleCapturePointTaskDurationReport.pdf||SampleCapturePointTaskDurationReport.pdf}}
+
{{Repository|SampleCapturePointTaskDurationReport_Cloud11-21.pdf||SampleCapturePointTaskDurationReport.pdf}}
|structuredtextwide=
 
|FAQHeading=
 
 
|Status=No
 
|Status=No
 
}}{{Section
 
}}{{Section
Line 34: Line 25:
 
|anchor=PromptsintheCapturePointTaskDurationReport
 
|anchor=PromptsintheCapturePointTaskDurationReport
 
|alignment=Vertical
 
|alignment=Vertical
|Media=
 
|image=
 
 
|structuredtext={{{!}}
 
|structuredtext={{{!}}
 
!'''Prompt'''
 
!'''Prompt'''
Line 57: Line 46:
 
{{!}}Capture Point
 
{{!}}Capture Point
 
{{!}}Optionally, select a Capture Point on which to focus the report.
 
{{!}}Optionally, select a Capture Point on which to focus the report.
 +
{{!}}-
 +
{{!}}Media Type
 +
{{!}}Optionally, select one or more media types for which to gather data into the report.
 +
{{!}}-
 +
{{!}}Category Level 3
 +
{{!}}Optionally, select one or more Category Level 3 from which to gather data for the report.
 +
{{!}}-
 +
{{!}}Category Level 4
 +
{{!}}Optionally, select one or more Category Level 4 from which to gather data for the report.
 +
{{!}}-
 +
{{!}}Category Level 5
 +
{{!}}Optionally, select one or more Category Level 5 from which to gather data for the report.
 
{{!}}-
 
{{!}}-
 
{{!}}}
 
{{!}}}
|structuredtextwide=
 
|FAQHeading=
 
 
|Status=No
 
|Status=No
 
}}{{Section
 
}}{{Section
Line 66: Line 65:
 
|anchor=AttributesintheCapturePointTaskDurationReport
 
|anchor=AttributesintheCapturePointTaskDurationReport
 
|alignment=Vertical
 
|alignment=Vertical
|Media=
 
|image=
 
 
|structuredtext={{{!}}
 
|structuredtext={{{!}}
 
!'''Attribute'''
 
!'''Attribute'''
 
!'''Description'''
 
!'''Description'''
!'''Data Mart Table.Column'''
 
 
{{!}}-
 
{{!}}-
 
{{!}}Department<!--(Was not present in the GI2 report)-->
 
{{!}}Department<!--(Was not present in the GI2 report)-->
 
{{!}}Enables data to be organized by the name of the department for which iWD prioritizes and routes tasks.
 
{{!}}Enables data to be organized by the name of the department for which iWD prioritizes and routes tasks.
{{!}}DEPARTMENT.DEPARTMENT_NAME
 
 
{{!}}-
 
{{!}}-
 
{{!}}Capture Point
 
{{!}}Capture Point
 
{{!}}Enables data to be organized by the name of the capture point that acquired tasks from the source system.
 
{{!}}Enables data to be organized by the name of the capture point that acquired tasks from the source system.
{{!}}CAPTURE_POINT.CAPTURE_POINT_NAME
 
 
{{!}}-
 
{{!}}-
 
{{!}}Process<!--(Was not present in the GI2 report)-->
 
{{!}}Process<!--(Was not present in the GI2 report)-->
 
{{!}}Enables data to be organized by the name of the business process, which is a core attribute of tasks and work items that define strategies for how to route them.
 
{{!}}Enables data to be organized by the name of the business process, which is a core attribute of tasks and work items that define strategies for how to route them.
{{!}}PROCESS.PROCESS_NAME
+
{{!}}-
 +
{{!}}Media Type
 +
{{!}}Enables data to be organized by media type.
 
{{!}}-
 
{{!}}-
 
{{!}}Day
 
{{!}}Day
 
{{!}}Enables data within the reporting interval to be organized by a particular day within a month and year. Day values are presented in YYYY-MM-DD format.
 
{{!}}Enables data within the reporting interval to be organized by a particular day within a month and year. Day values are presented in YYYY-MM-DD format.
{{!}}DATE_TIME.LABEL_YYYY_MM_DD
+
{{!}}-
 +
{{!}}Category Level&nbsp;3
 +
{{!}}Enables data to be organized by the 3rd category level.
 +
{{!}}-
 +
{{!}}Category Level&nbsp;4
 +
{{!}}Enables data to be organized by the 4th category level.
 +
{{!}}-
 +
{{!}}Category Level&nbsp;5
 +
{{!}}Enables data to be organized by the 5th category level.
 
{{!}}-
 
{{!}}-
 
{{!}}}
 
{{!}}}
|structuredtextwide=
 
|FAQHeading=
 
 
|Status=No
 
|Status=No
 
}}{{Section
 
}}{{Section
Line 97: Line 99:
 
|anchor=MetricsintheCapturePointTaskDurationReport
 
|anchor=MetricsintheCapturePointTaskDurationReport
 
|alignment=Vertical
 
|alignment=Vertical
|Media=
 
|image=
 
 
|structuredtext={{{!}}
 
|structuredtext={{{!}}
 
!'''Metric'''
 
!'''Metric'''
 
!'''Description'''
 
!'''Description'''
!'''Source or Calculation'''
 
{{!}}-
 
{{!}}New
 
{{!}}Number of new tasks that were submitted to iWD during the given time interval. Tasks are counted only after they have been classified.
 
{{!}}TASK_CAPT_FACT.NEW_TASK_COUNT
 
 
{{!}}-
 
{{!}}-
 
{{!}}Finished
 
{{!}}Finished
{{!}}The total number of tasks that entered the iWD system through this capture point and were completed during the reporting interval.
+
{{!}}The total number of tasks that entered the iWD system through this capture point and were finished during the reporting interval.
{{!}}IWD_AGG_TASK_CAPT_[Y,Q,M,W,D,H,15].CMPL_TASK_COUNT
 
 
{{!}}-
 
{{!}}-
{{!}}Avg Handle Time (Fmt)
+
{{!}}Avg Handle Time
 
{{!}}For tasks that entered the iWD system through this capture point, the average amount of time that resources worked on the tasks before completing them.
 
{{!}}For tasks that entered the iWD system through this capture point, the average amount of time that resources worked on the tasks before completing them.
{{!}}Calculated based on the value of the Handle Time and Finished metrics, where:
 
 
*Handle Time is: IWD_AGG_TASK_CAPT_[Y,Q,M,W,D,H,15].CMPL_TASK_WORK_TIME
 
*Finished is: IWD_AGG_TASK_CAPT_[Y,Q,M,W,D,H,15].CMPL_TASK_COUNT
 
 
{{!}}-
 
{{!}}-
{{!}}Avg Accept Time (Fmt)
+
{{!}}Avg Accept Time
{{!}}For completed tasks that entered the iWD system through this capture point, the average amount of time that elapsed before the tasks were assigned to a resource for the first time. This metric reflects how long, on average, tasks were backlogged.
+
{{!}}For finished tasks, the average amount of time, in seconds, before a task was assigned for the first time. This is calculated as the (task-assigned – task-creation) timestamp for finished tasks during the given time interval. This measure reflects how long tasks were backlogged before they were assigned to an agent.
{{!}}Calculated based on the value of the Accept Time and Finished metrics, where:
 
 
 
*Accept Time is: IWD_AGG_TASK_CAPT_[Y,Q,M,W,D,H,15].CMPL_TASK_ASSIGN_TIME
 
*Finished is: IWD_AGG_TASK_CAPT_[Y,Q,M,W,D,H,15].CMPL_TASK_COUNT
 
 
{{!}}-
 
{{!}}-
{{!}}Avg Finish Time (Fmt)
+
{{!}}Avg Finish Time
{{!}}For tasks that entered the iWD system through this capture point, the average amount of time that elapsed before the tasks were completed. This measure includes the time that tasks were backlogged as well as work time.
+
{{!}}The average amount of time, in seconds, before a task was finished. This is calculated as the (task-completed – task-creation) timestamp for finished tasks during the given time interval. Like CMPL_TASK_AVG_ASSIGN_TIME, this measure reflects the time that tasks were backlogged as well as work time.
{{!}}Calculated based on the value of the Finish Time and Finished metrics, where:
 
 
 
*Finish Time is: IWD_AGG_TASK_CAPT_[Y,Q,M,W,D,H,15].CMPL_TASK_COMPLETE_TIME
 
*Finished is: IWD_AGG_TASK_CAPT_[Y,Q,M,W,D,H,15].CMPL_TASK_COUNT
 
 
{{!}}-
 
{{!}}-
{{!}}Avg Source System Time (Fmt)
+
{{!}}Avg Source System Time
{{!}}For completed tasks that entered the iWD system through this capture point, the average amount of time the tasks spent in the preceding system before they were created within iWD.
+
{{!}}For finished tasks that entered the iWD system through this capture point, the average amount of time the tasks spent in the preceding system before they were created within iWD.
{{!}}Calculated based on the Source System Time and Finished metrics, where:
 
 
 
*Source System Time is: IWD_AGG_TASK_CAPT_[Y,Q,M,W,D,H,15].CMPL_TASK_SRC_TIME
 
*Finished is: IWD_AGG_TASK_CAPT_[Y,Q,M,W,D,H,15].CMPL_TASK_COUNT
 
 
{{!}}-
 
{{!}}-
{{!}}Avg Pre-Source System Time (Fmt)
+
{{!}}Avg Pre-Source System Time
{{!}}For completed tasks that entered the iWD system through this capture point, the average amount of time the tasks spent in the presource system.
+
{{!}}For finished tasks that entered the iWD system through this capture point, the average amount of time the tasks spent in the pre-source system.
{{!}}Calculated based on to the Pre Source System Time and Finished metrics, where:
 
 
 
*Pre Source System Time is: IWD_AGG_TASK_CAPT_[Y,Q,M,W,D,H,15].CMPL_TASK_PRE_SRC_TIME
 
*Finished is: IWD_AGG_TASK_CAPT_[Y,Q,M,W,D,H,15].CMPL_TASK_COUNT
 
 
{{!}}-
 
{{!}}-
 
{{!}}}
 
{{!}}}
</onlyinclude>
+
===Custom metrics===
|structuredtextwide=
+
{{{!}}
|FAQHeading=
+
!'''Metric'''
 +
!'''Description'''
 +
{{!}}-
 +
{{!}}Canceled
 +
{{!}}The total number of tasks that entered the iWD system through this capture point and were canceled during the reporting interval.
 +
{{!}}-
 +
{{!}}Completed
 +
{{!}}The total number of tasks that entered the iWD system through this capture point and were completed during the reporting interval.
 +
{{!}}-
 +
{{!}}Canceled Autocompleted
 +
{{!}}The total number of email tasks of this classification that were automatically canceled during the reporting interval.
 +
{{!}}-
 +
{{!}}Canceled NON Autocompleted
 +
{{!}}The total number of canceled tasks in this classification that were not automatically canceled during the reporting period.
 +
{{!}}-
 +
{{!}}Completed Agent
 +
{{!}}The total number of tasks that were completed during the reporting interval and in which one or more agents were involved.
 +
{{!}}-
 +
{{!}}Completed NON Agent
 +
{{!}}The total number of tasks of this classification that were completed during the reporting interval for tasks where no agents were involved (via API, designer, etc.).
 +
{{!}}-
 +
{{!}}Finished Agent
 +
{{!}}The total number of tasks of this classification that were finished (completed or canceled) during the reporting interval for tasks where an agent was involved.
 +
{{!}}}</onlyinclude>
 
|Status=No
 
|Status=No
 
}}
 
}}
 
}}
 
}}

Latest revision as of 08:00, June 29, 2022

This topic is part of the manual Work with Genesys CX Insights Reports for version Current of Reporting.

This page describes how you (as a business user or technical business user) can use the (CX Insights for iWD folder) > Capture Point Task Duration Report to identify and plan remediation for bottlenecks in the system. The technical business user can then tune routing strategies and associated business rules in order to reduce bottlenecks and routing milestones. This is particularly useful if you base distribution strategies or business operations around the point (the capture point) through which tasks enter the iWD system.

Understanding the Capture Point Task Duration Report

This report breaks down the overall average duration time that is spent to complete tasks (from inception within the presource system to termination within iWD) into average task durations at defined milestones along a task’s routed path for each capture point.

To get a better idea of what this report looks like, view sample output from the report:

SampleCapturePointTaskDurationReport.pdf

Prompts in the Capture Point Task Duration Report

Prompt Description
Pre-set Date Filter Choose from the convenient list of predefined rolling time ranges, spanning one day or more, over which to run the report.
Start Time Choose the first day and time from which to gather report data.
End Time Choose the last day and time from which to gather report data.
Department Optionally, select a department on which to focus the report.
Process Optionally, select a business process on which to focus the report.
Capture Point Optionally, select a Capture Point on which to focus the report.
Media Type Optionally, select one or more media types for which to gather data into the report.
Category Level 3 Optionally, select one or more Category Level 3 from which to gather data for the report.
Category Level 4 Optionally, select one or more Category Level 4 from which to gather data for the report.
Category Level 5 Optionally, select one or more Category Level 5 from which to gather data for the report.

Attributes in the Capture Point Task Duration Report

Attribute Description
Department Enables data to be organized by the name of the department for which iWD prioritizes and routes tasks.
Capture Point Enables data to be organized by the name of the capture point that acquired tasks from the source system.
Process Enables data to be organized by the name of the business process, which is a core attribute of tasks and work items that define strategies for how to route them.
Media Type Enables data to be organized by media type.
Day Enables data within the reporting interval to be organized by a particular day within a month and year. Day values are presented in YYYY-MM-DD format.
Category Level 3 Enables data to be organized by the 3rd category level.
Category Level 4 Enables data to be organized by the 4th category level.
Category Level 5 Enables data to be organized by the 5th category level.

Metrics in the Capture Point Task Duration Report

Metric Description
Finished The total number of tasks that entered the iWD system through this capture point and were finished during the reporting interval.
Avg Handle Time For tasks that entered the iWD system through this capture point, the average amount of time that resources worked on the tasks before completing them.
Avg Accept Time For finished tasks, the average amount of time, in seconds, before a task was assigned for the first time. This is calculated as the (task-assigned – task-creation) timestamp for finished tasks during the given time interval. This measure reflects how long tasks were backlogged before they were assigned to an agent.
Avg Finish Time The average amount of time, in seconds, before a task was finished. This is calculated as the (task-completed – task-creation) timestamp for finished tasks during the given time interval. Like CMPL_TASK_AVG_ASSIGN_TIME, this measure reflects the time that tasks were backlogged as well as work time.
Avg Source System Time For finished tasks that entered the iWD system through this capture point, the average amount of time the tasks spent in the preceding system before they were created within iWD.
Avg Pre-Source System Time For finished tasks that entered the iWD system through this capture point, the average amount of time the tasks spent in the pre-source system.

Custom metrics

Metric Description
Canceled The total number of tasks that entered the iWD system through this capture point and were canceled during the reporting interval.
Completed The total number of tasks that entered the iWD system through this capture point and were completed during the reporting interval.
Canceled Autocompleted The total number of email tasks of this classification that were automatically canceled during the reporting interval.
Canceled NON Autocompleted The total number of canceled tasks in this classification that were not automatically canceled during the reporting period.
Completed Agent The total number of tasks that were completed during the reporting interval and in which one or more agents were involved.
Completed NON Agent The total number of tasks of this classification that were completed during the reporting interval for tasks where no agents were involved (via API, designer, etc.).
Finished Agent The total number of tasks of this classification that were finished (completed or canceled) during the reporting interval for tasks where an agent was involved.
Comments or questions about this documentation? Contact us for support!