Difference between revisions of "PEC-REP/Current/RPRT/HRCXIiWDCptrPntTskDrtn"

From Genesys Documentation
Jump to: navigation, search
(Published)
(Published)
Line 15: Line 15:
 
|alignment=Horizontal
 
|alignment=Horizontal
 
|Media=Image
 
|Media=Image
|image=HRCXICapturePointTaskDuration_cloud.png
+
|image=HRCXICapturePointTaskDuration_Cloud11-21.png
 
|structuredtext=This report breaks down the overall average duration time that is spent to complete tasks (from inception within the presource system to termination within iWD) into average task durations at defined milestones along a task’s routed path for each capture point.
 
|structuredtext=This report breaks down the overall average duration time that is spent to complete tasks (from inception within the presource system to termination within iWD) into average task durations at defined milestones along a task’s routed path for each capture point.
  
 
To get a better idea of what this report looks like, view sample output from the report:<br />
 
To get a better idea of what this report looks like, view sample output from the report:<br />
{{Repository|SampleCapturePointTaskDurationReport_cloud.pdf||SampleCapturePointTaskDurationReport.pdf}}
+
{{Repository|SampleCapturePointTaskDurationReport_Cloud11-21.pdf||SampleCapturePointTaskDurationReport.pdf}}
 
|Status=No
 
|Status=No
 
}}{{Section
 
}}{{Section
Line 49: Line 49:
 
{{!}}Media Type
 
{{!}}Media Type
 
{{!}}Optionally, select one or more media types for which to gather data into the report.
 
{{!}}Optionally, select one or more media types for which to gather data into the report.
 +
{{!}}-
 +
{{!}}Category Level 3
 +
{{!}}Optionally, select one or more Category Level 3 from which to gather data for the report.
 +
{{!}}-
 +
{{!}}Category Level 4
 +
{{!}}Optionally, select one or more Category Level 4 from which to gather data for the report.
 +
{{!}}-
 +
{{!}}Category Level 5
 +
{{!}}Optionally, select one or more Category Level 5 from which to gather data for the report.
 
{{!}}-
 
{{!}}-
 
{{!}}}
 
{{!}}}
Line 80: Line 89:
 
{{!}}Enables data within the reporting interval to be organized by a particular day within a month and year. Day values are presented in YYYY-MM-DD format.
 
{{!}}Enables data within the reporting interval to be organized by a particular day within a month and year. Day values are presented in YYYY-MM-DD format.
 
{{!}}DATE_TIME.LABEL_YYYY_MM_DD
 
{{!}}DATE_TIME.LABEL_YYYY_MM_DD
 +
{{!}}-
 +
{{!}}Category Level&nbsp;3
 +
{{!}}Enables data to be organized by the 3rd category level.
 +
{{!}}PROCESS.CATEGORY_LEVEL3
 +
{{!}}-
 +
{{!}}Category Level&nbsp;4
 +
{{!}}Enables data to be organized by the 4th category level.
 +
{{!}}PROCESS.CATEGORY_LEVEL4
 +
{{!}}-
 +
{{!}}Category Level&nbsp;5
 +
{{!}}Enables data to be organized by the 5th category level.
 +
{{!}}PROCESS.CATEGORY_LEVEL5
 
{{!}}-
 
{{!}}-
 
{{!}}}
 
{{!}}}

Revision as of 17:03, January 25, 2022

This topic is part of the manual Work with Genesys CX Insights Reports for version Current of Reporting.

This page describes how you (as a business user or technical business user) can use the (CX Insights for iWD folder) > Capture Point Task Duration Report to identify and plan remediation for bottlenecks in the system. The technical business user can then tune routing strategies and associated business rules in order to reduce bottlenecks and routing milestones. This is particularly useful if you base distribution strategies or business operations around the point (the capture point) through which tasks enter the iWD system.

Understanding the Capture Point Task Duration Report

This report breaks down the overall average duration time that is spent to complete tasks (from inception within the presource system to termination within iWD) into average task durations at defined milestones along a task’s routed path for each capture point.

To get a better idea of what this report looks like, view sample output from the report:

SampleCapturePointTaskDurationReport.pdf

Prompts in the Capture Point Task Duration Report

Prompt Description
Pre-set Date Filter Choose from the convenient list of predefined rolling time ranges, spanning one day or more, over which to run the report.
Start Time Choose the first day and time from which to gather report data.
End Time Choose the last day and time from which to gather report data.
Department Optionally, select a department on which to focus the report.
Process Optionally, select a business process on which to focus the report.
Capture Point Optionally, select a Capture Point on which to focus the report.
Media Type Optionally, select one or more media types for which to gather data into the report.
Category Level 3 Optionally, select one or more Category Level 3 from which to gather data for the report.
Category Level 4 Optionally, select one or more Category Level 4 from which to gather data for the report.
Category Level 5 Optionally, select one or more Category Level 5 from which to gather data for the report.

Attributes in the Capture Point Task Duration Report

Attribute Description Data Mart Table.Column
Department Enables data to be organized by the name of the department for which iWD prioritizes and routes tasks. DEPARTMENT.DEPARTMENT_NAME
Capture Point Enables data to be organized by the name of the capture point that acquired tasks from the source system. CAPTURE_POINT.CAPTURE_POINT_NAME
Process Enables data to be organized by the name of the business process, which is a core attribute of tasks and work items that define strategies for how to route them. PROCESS.PROCESS_NAME
Media Type Enables data to be organized by media type. MEDIA_TYPE.MEDIA_TYPE_NAME
Day Enables data within the reporting interval to be organized by a particular day within a month and year. Day values are presented in YYYY-MM-DD format. DATE_TIME.LABEL_YYYY_MM_DD
Category Level 3 Enables data to be organized by the 3rd category level. PROCESS.CATEGORY_LEVEL3
Category Level 4 Enables data to be organized by the 4th category level. PROCESS.CATEGORY_LEVEL4
Category Level 5 Enables data to be organized by the 5th category level. PROCESS.CATEGORY_LEVEL5

Metrics in the Capture Point Task Duration Report

Metric Description Source or Calculation
New Number of new tasks that were submitted to iWD during the given time interval. Tasks are counted only after they have been classified. TASK_CAPT_FACT.NEW_TASK_COUNT
Finished The total number of tasks that entered the iWD system through this capture point and were completed during the reporting interval. IWD_AGG_TASK_CAPT_[Y,Q,M,W,D,H,15].CMPL_TASK_COUNT
Avg Handle Time (Fmt) For tasks that entered the iWD system through this capture point, the average amount of time that resources worked on the tasks before completing them. Calculated based on the value of the Handle Time and Finished metrics, where:
  • Handle Time is: IWD_AGG_TASK_CAPT_[Y,Q,M,W,D,H,15].CMPL_TASK_WORK_TIME
  • Finished is: IWD_AGG_TASK_CAPT_[Y,Q,M,W,D,H,15].CMPL_TASK_COUNT
Avg Accept Time (Fmt) For completed tasks that entered the iWD system through this capture point, the average amount of time that elapsed before the tasks were assigned to a resource for the first time. This metric reflects how long, on average, tasks were backlogged. Calculated based on the value of the Accept Time and Finished metrics, where:
  • Accept Time is: IWD_AGG_TASK_CAPT_[Y,Q,M,W,D,H,15].CMPL_TASK_ASSIGN_TIME
  • Finished is: IWD_AGG_TASK_CAPT_[Y,Q,M,W,D,H,15].CMPL_TASK_COUNT
Avg Finish Time (Fmt) For tasks that entered the iWD system through this capture point, the average amount of time that elapsed before the tasks were completed. This measure includes the time that tasks were backlogged as well as work time. Calculated based on the value of the Finish Time and Finished metrics, where:
  • Finish Time is: IWD_AGG_TASK_CAPT_[Y,Q,M,W,D,H,15].CMPL_TASK_COMPLETE_TIME
  • Finished is: IWD_AGG_TASK_CAPT_[Y,Q,M,W,D,H,15].CMPL_TASK_COUNT
Avg Source System Time (Fmt) For completed tasks that entered the iWD system through this capture point, the average amount of time the tasks spent in the preceding system before they were created within iWD. Calculated based on the Source System Time and Finished metrics, where:
  • Source System Time is: IWD_AGG_TASK_CAPT_[Y,Q,M,W,D,H,15].CMPL_TASK_SRC_TIME
  • Finished is: IWD_AGG_TASK_CAPT_[Y,Q,M,W,D,H,15].CMPL_TASK_COUNT
Avg Pre-Source System Time (Fmt) For completed tasks that entered the iWD system through this capture point, the average amount of time the tasks spent in the presource system. Calculated based on to the Pre Source System Time and Finished metrics, where:
  • Pre Source System Time is: IWD_AGG_TASK_CAPT_[Y,Q,M,W,D,H,15].CMPL_TASK_PRE_SRC_TIME
  • Finished is: IWD_AGG_TASK_CAPT_[Y,Q,M,W,D,H,15].CMPL_TASK_COUNT
Comments or questions about this documentation? Contact us for support!