Terminate Call Block

From Genesys Documentation
Revision as of 15:23, June 8, 2020 by Bgrenon (talk | contribs) (Published)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
This topic is part of the manual Designer User's Guide for version Current of Designer.


Use this block to end the call and jump directly to the Finalize phase of the application.

Related documentation:

You can use the Terminate Call block to disconnect the caller and stop the call. Everything after the Terminate Call block is skipped, and the application moves straight to the Finalize phase.

As a visual aid, the right edge of the Terminate Call block is capped in red, to show that the application will stop if and when it reaches this block. This visual aid also applies to any block that might end the call, such as Business Hours or Special Day, when the Terminate Call option is enabled.

Comments or questions about this documentation? Contact us for support!